HP ml310 Manual Do Utilizador

Página de 123
26 
 HP ProLiant ML310 Generation 3 Server User Guide 
 
 
  HP ProLiant Essentials (HP SIM and RDP) 
  VMWare 
  Integrated hardware and software support 
  Critical Service 
  Proactive 24 
  Support Plus 
  Support Plus 24 
  Startup and implementation services for both hardware and software 
For more information on Care Packs, refer to the HP website 
(
 
Optimum environment 
When installing the server, select a location that meets the environmental 
standards described in this section. 
 
Space and airflow requirements 
Tower Server 
In a tower configuration, leave at least a 7.6-cm (3-in) clearance space at the 
front and back of the server for proper ventilation. 
Rack Server 
To allow for servicing and adequate airflow, observe the following space and 
airflow requirements when deciding where to install a rack: 
  Leave a minimum clearance of 76.2 cm (30 in) in front of the rack. 
  Leave a minimum clearance of 76.2 cm (30 in) behind the rack. 
  Leave a minimum clearance of 121.9 cm (48 in) from the back of the rack to 
the back of another rack or row of racks.