Panasonic TY-CE42PS1 Manual Do Utilizador

Página de 52
5
English
4. Attach the ceiling unit (lower section).
• When adjusting the height, no more that 4 holes should
be visible. (The white line should not show.)
Note
Washer pan nut
Spring washer
Fixing bolt
M8-100
M8 bolt
M8-12
Hidden 
side
Ceiling unit
(upper section)
M8 assembly screw
M8 assembly screw
White line
(Example)
Ceiling unit 
(lower section)
 
Distance from
center of display
to ceiling  ( in.)
Center of 
display
Height adjustment 
holes
  1085mm (42 
23/32
)
 985mm (38 
25/32
)
885mm (34 
27/32
)
785mm (30 
29/32
)
1. Match the height adjustment holes on
the upper and lower sections to the
desired height and refasten in place
with two M8 assembly screws.
2. Insert the fixing bolt (M8-100) through
the spring washer and then insert it
through the uppermost hole in the pipe.
Fasten in place with the washer pan
nut (all included).
3. Tighten with two fixing bolts (M8-12,
included) so that the lower section
does not move.
5. Prepare the display.
Remove the four bolts.




Pan head bolt with hex socket
Toothed pan washer 
Insulating spacer
1. Remove the four bolts from the display.
2. In each of the four bolt holes, insert a
pan head bolt with hex socket (M8-45),
toothed pan washer and insulating
spacer (four each, all included). Insert
as shown in the diagram on the left.
Install the insulating spacers in the display unit. 
Lay the display with the screen facing down on a clean blanket or sheet and follow the steps
below.