Zebra 49834 Manual Do Utilizador
208
170PAX4 Maintenance Manual
57518L-001 Rev. A
3/18/05
Preventive and Corrective Maintenance
Drive System—Intermediate Pulley
Intermediate Pulley
This procedure is for rebuilding the intermediate pulley assembly. Read these instructions
thoroughly before starting this procedure.
thoroughly before starting this procedure.
Tools Required
Installation Instructions
1.
Refer to
and remove the print engine from the applicator and open
the rear enclosure.
2.
Refer to
and remove the PCB Access Panel.
Remove the Control Panel
1.
. From the back of the mainframe, remove the two screws holding the
control panel assembly.
2.
Move the control panel assembly to the side to provide access to the upper mounting
screw for the AC power supply assembly.
screw for the AC power supply assembly.
Caution • A qualified service technician must perform this installation.
Caution • Turn Off (
O
) the AC power switch and remove the power cord before
performing this procedure.
Phillips Screwdriver Set
Anti-Static Wriststrap and Mat
Metric Hex Key (Allen Wrench) Set
Standard Nutdriver Se
Flat-blade Screwdriver Set
Metric Nutdriver Set
Screwdriver, Phillips No. 1, Extended
Reach (10 in. shaft), Magnetic
Needle Nose Pliers
Long Needle Nose Pliers
Standard Hex Key (Allen Wrench) Set
Snap Ring Tool
Safety Glasses