Cisco CATALYST 6509E 9 SLOT 15U CHASSIS NO POWER SUPPLY NO FAN TRAY Guia De Especificação
![Cisco](https://files.manualsbrain.com/attachments/7380d0050044647c30f5c24bbbf5d0c0b6d9bb84/common/fit/150/50/faa183d287233c52228cfea3dbc2a127fe780f60564fcb0955d9c3d1cd23/brand_logo.png)
2-23
Catalyst 6500 Series Switches Installation Guide
OL-5781-04
Chapter 2 Preparing for Installation
Site Preparation Checklist
5
Cable and interface equipment evaluation:
•
Cable type
•
Connector type
•
Cable distance limitations
•
Interface equipment (transceivers)
6
EMI evaluation:
•
Distance limitations for signaling
•
Site wiring
•
RFI levels
1.
Verify that each power supply installed in the chassis has a dedicated AC source or DC source circuit.
Table 2-4
Site Planning Checklist (continued)
Task No.
Planning Activity
Verified By Time
Date