Cisco CATALYST 6509E 9 SLOT 15U CHASSIS NO POWER SUPPLY NO FAN TRAY Specification Guide

Page of 336
2-23
Catalyst 6500 Series Switches Installation Guide
OL-5781-04
Chapter 2      Preparing for Installation
  Site Preparation Checklist
5
Cable and interface equipment evaluation:
Cable type
Connector type
Cable distance limitations
Interface equipment (transceivers)
6
EMI evaluation:
Distance limitations for signaling
Site wiring
RFI levels
1.
Verify that each power supply installed in the chassis has a dedicated AC source or DC source circuit. 
Table 2-4
Site Planning Checklist (continued)
Task No.
Planning Activity 
Verified By Time
Date