Huawei Technologies Co. Ltd BTS3812E-1900 Manual Do Utilizador

Página de 132
NodeB LMT User Guide 
Chapter 8  Tracing NodeB Iub Interface Signaling
 
III. Procedure 
Follow the steps below to create a tracing task: 
1) 
Choose Maintenance Navigator -> Tracing Management. Then double-click 
Standard Interface Tracing subnode.  
A prompt dialog box opens up. 
 
  Note: 
You may clear the check box of Show tips at startup next time 
in the dialog box
. This 
dialog box does not appear when you start a tracing task next time. 
 
2) 
Click 
Continue 
in the dialog box. 
 
The Standard Interface Tracing dialog box opens up as shown in Figure 8-1.  
Figure 8-1 shows the Standard Interface Tracing dialog box. 
 
Figure 8-1 Standard Interface Tracing dialog box 
3) 
Click 
Advanced….  
The Advanced dialog box opens up as shown in Figure 8-2. 
Huawei Technologies Proprietary 
8-3