Spectralink Corporation RCH400 Manual Do Utilizador
SpectraLink Corporation
Installing the Outdoor Base Station
3. Installing on an I-Beam
Items provided : Outdoor enclosure, Base Station
Items needed :
Items needed :
4 - “Caddy” or “B-Line” 3/8” Beam Clamps
4 - ½” ¼” x 20 bolts
4 - 2” ¼” x 20 bolts
4 - ¼” x 20 nuts
4 - ½” ¼” x 20 bolts
4 - 2” ¼” x 20 bolts
4 - ¼” x 20 nuts
1. Attach a beam clamp to the center of the top and bottom flanges on the outdoor
enclosure.
2. Attach a second beam clamp to each of the beam clamps on the enclosure using
a ½” ¼” x 20 bolt and a nut. (See Picture Below)
3. Attach the outdoor enclosure to I-Beam using the beam clamps attached in step
2.
See figures in Section 2 for pictorial data for the remaining steps:
4. Slide the Base Station cable through the compression fitting and tighten the
4. Slide the Base Station cable through the compression fitting and tighten the
fitting.
5. Crimp on RJ45 onto the Base Station cable using the same wiring guide as the
indoor Base Station.
6. Plug the RJ45 into the RJ48C connector.
7. Place the Base Station into the enclosure with the side of the Base Station with
7. Place the Base Station into the enclosure with the side of the Base Station with
the mounting hole facing the I-beam. The Base Station should fit tightly
between the foam.
between the foam.
8. Screw the outdoor enclosure lid back onto the enclosure.
PN: 72-0050-00-D.doc
Page 8