 7–2  Commissioning HTs
Hub installation
To ensure successful commissioning, you must verify that the
prerequisites listed below have been accomplished.
 These tasks
must all be completed prior to commissioning. If any of them has
not been done, make sure they are completed before you proceed
with commissioning.
The HT ODU, IFL, and IDU must be installed and
connected.
The Element Management System (EMS) hardware and
software must be installed and operational.
All physical LAN connections between the HT and EMS
must be completed and operational.
If the EMS is remote from the HT, the entire end–to–end link
must be verified as operational. The EMS must be able to
ping the hub LAN router and the specific port to be
connected to the HT.
The EMS database must be loaded and operational.
The EMS operator has to enter the HT MAC address and
configure the HT in the EMS database.
(The HT MAC address is printed on a tag attached to the
CCM and can also be read from the CCM LCD—from the
Main Menu MAC display.)
The CCM must be installed in the IDU. (SSIs are not
required for commissioning.)
Configure EMS and hub routers for EMS–hub
communication.
The hub router boot relay agent must be configured to
forward boot requests from the HT to the EMS.
If a backup HT has been installed, a CCM redundancy bus
cable must be connected.
7.1
Prerequisites for
commissioning