Appendix E  Antenna Line Sweeps Procedure 
 
84 
TDC-0971-011 CCU 100 and Repeater 100 Installation Guide 
 
Proprietary and Confidential  
 
The following illustration shows the Anritsu Site Master. 
 
 
Testing on a Network Device with a Remotely-Mounted 900 
MHz Antenna 
When the 900 MHz antenna is remotely mounted, perform antenna and line sweeping 
tests to verify that the transmission system functions within acceptable tolerances. While 
monitoring sweep results, move all connectors on jumpers and coax to ensure all 
connectors are properly installed and reliable. 
 
Note  There should be no variance in sweep tests while stressing 
connections. 
 
 
General Testing Conditions 
Perform sweep testing under the following general testing conditions: 
•  Overall System Return Loss:  Must be -14 dB or better for the specified frequency 
band. Any deviations from this return loss warrant further investigation. 
•  VSWR Expected Results: 1.5 : 1 or less for the specified frequency band. 
•  Test Point:  Feed line connected to the antenna at the top; test from the lightning (or 
surge) arrestor to the antenna port. 
•  Results: Test results must be saved in PDF format. 
•  Test Equipment Requirements: Current and proper calibration; be sure that 
calibration is turned on during the test. A qualified operator of the test equipment 
must perform the test. 
Note  If the system does not perform to the above test specifications, the reasons for 
system failure and possible remedies must be identified before leaving the site.