Itron Inc. CCU100T Manual Do Utilizador

Página de 64
Chapter 3  Installing the CCU/Repeater 
 
34 
 CCU 100 and Repeater 100 Installation Guide 
 
Proprietary and Confidential
 
 
 
 
Tower Installation Overview 
The Tower CCU 100 (TCU)  installation differs significantly from other CCU 100 
installation profiles in that the CCU 100 is installed within a cabinet enclosure at the base of 
a radio tower and all of the antennas are mounted remotely. The standard cabinet protects 
the hardware from adverse environmental conditions and provides easy access for servicing 
the CCU and its related components. 
The TCU box comes preassembled except for the CCU.  The CCU must have the ICS 
procedure performed prior to installing the CCU in the TCU box.