N. V. Nederlandsche Apparatenfabriek NEDAP SENSITEPL Manual Do Utilizador

Página de 92
SENSIT SYSTEM | MANUAL 
Mounting The Relay Node 2G
 
 
37/92 
7.6 
INSTALLATION PROCEDURE 
Below the mounting procedure for the Relay Node 2G. The Relay Node 2G features visual 
status feedback using two LED indicators: a green and a red LED. 
 
SENSIT Relay Node 2G mounting procedure 
 
Step 1: 
Mounting 
Mount the reflector and top of the housing 
on the pole or wall. With the Nedap asterisk 
at the top. The Relay Node 2G can also be 
mounted without the reflector for an omni-
directional radiation pattern. 
 
Step 2:  
Power the Relay 
Node 
Remove the isolation tabs, to power up the 
Relay Node.  
 
Step 3:  
Verify start-up  
Green LED starts blinking fast (duration: 15 
sec.), indicating that battery power has 
been connected correctly.  
 
 
 
Step 4: 
 WSN search 
 
Red LED starts to blink slowly. This 
indicates that the Relay Node didn’t found 
an active WSN (wireless SENSIT Network) 
yet. It is searching for a WSN. 
 
 
Step 5:  
WSN found 
Green LED starts slow blinking and red LED 
is turned off. This indicates that a WSN has 
been found.  
 
 
Step 6:  
Final installation 
Now the Relay Node electronics can be 
installed at the pole or wall with a TORX 
(T20) screw driver.  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note 
The Green and Red feedback 
LED’s are located in the 
yellow circle. 
 
Note 
After 15 minutes LED 
feedback is turned off, to save 
battery power. 
 
Note 
After 1 minute the LED 
feedback is turned off, to save 
battery power.