Electrical and Network Wiring
For the new Liberty UHX pedestal the following wiring is required:
• Electrical - 1 gauge wire (shielded). 1 wire required per pedestal.
• Network - CAT 5 or 5e cable (un-shielded twisted pairs). 1 cable required per pedestal.
To complete the network and electrical installation and wiring,
• Electrical - 1 gauge wire (shielded). 1 wire required per pedestal.
• Network - CAT 5 or 5e cable (un-shielded twisted pairs). 1 cable required per pedestal.
To complete the network and electrical installation and wiring,
1
Checkpoint contractor installs one or two additional shelves in the ceiling on one side
of the entry way or attaches the 3 power supplies directly to the studded wall.
•
Each shelf must support two (2) power supplies along with all required controls.
•
Each shelf must support 1 network access point.
•
Six (6) power supplies are required for a six (6) pedestal installation. Each supply
powers a single pedestal.
2
Checkpoint contractor ensures that the power supplies are within AC power cord
range (4 feet) of the outlet box.
A licensed electrician may be required for this part of the installation. Please consult local