I n s t a l l i n g   L i b e r t y   U H X   P e d e s t a l s :   E l e c t r i c a l   a n d   N e t w o r k   W i r i n g  
3-2
Electrical and Network Wiring
For the new Liberty UHX pedestal the following wiring is required:
• Electrical - 1 gauge wire (shielded). 1 wire required per pedestal.
• Network - CAT 5 or 5e cable (un-shielded twisted pairs). 1 cable required per pedestal.
To complete the network and electrical installation and wiring, 
1
 Checkpoint contractor installs one or two additional shelves in the ceiling on one side 
of the entry way or attaches the 3 power supplies directly to the studded wall.
Each shelf must support two (2) power supplies along with all required controls.
Each shelf must support 1 network access point.
Six (6) power supplies are required for a six (6) pedestal installation. Each supply 
powers a single pedestal.
2
 Checkpoint contractor ensures that the power supplies are within AC power cord 
range (4 feet) of the outlet box.
A licensed electrician may be required for this part of the installation. Please consult local 