Baicells Technologies Co. Ltd. BRU3501 Manual Do Utilizador

Página de 29
Nova-243 Outdoor LTE TDD Base Station Installation Guide 
16 
 
 
7.  After the cable connection is complete in the wiring cavity, tighten the screws on the 
cover to close the wiring cavity using M4 cross screwdriver. 
3.6.6  Connect Ground Cable 
Make the grounding cable according the actual situation of the installation site. 
The  Nova-243  provides  two  grounding  screws,  which  is  located  on  the  bottom  of  the 
base station, as shown in Figure 3-4. 
Figure 3-4 Location of Grounding Screws 
  
1.  Unscrew  one  grounding  screw,  connect  one  end  of  the  grounding  cable  to  the 
grounding screw, and fasten it again. 
2.  The other end of the ground cable needs to connect to a good grounding point. 
The connection point can be done with rust preventing paint, anti-oxidation coatings, 
grease, etc.