Preparation and installation shall be in accordance with reviewed product data, final shop
drawings, manufacturer’s written recommendations, and as indicated on the Drawings.
drawings, manufacturer’s written recommendations, and as indicated on the Drawings.
3.3
FIELD QUALITY CONTROL
A.
General: See [Section 01 45 23 - INSPECTING AND TESTING SERVICES]
[Section 01410 - INSPECTING AND TESTING SERVICES].
[Section 01410 - INSPECTING AND TESTING SERVICES].
B.
Field Service Engineer Qualifications: The manufacturer shall employ a 7 x 24 nationwide
(international where applicable) field service organization with rapid access to all regions of the
nation. The responding service professionals shall be factory-trained engineers with an
accredited and proven competence to service three-phase UPS.
(international where applicable) field service organization with rapid access to all regions of the
nation. The responding service professionals shall be factory-trained engineers with an
accredited and proven competence to service three-phase UPS.
C.
Spare Parts: Field Engineers shall have immediate access to recommended spare parts
with additional parts storage located in regional depots. Additional spare parts shall be
accessible on a 7 x 24 basis from the national depot and shall be expedited on a next
available flight basis or via direct courier (whichever mode is quickest).
with additional parts storage located in regional depots. Additional spare parts shall be
accessible on a 7 x 24 basis from the national depot and shall be expedited on a next
available flight basis or via direct courier (whichever mode is quickest).
3.4 DEMONSTRATION
A.
Provide the services of a factory-authorized service representative of the manufacturer to
provide start-up service and to demonstrate and train the Owner’s personnel.
1.
provide start-up service and to demonstrate and train the Owner’s personnel.
1.
Test and adjust controls and safeties. Replace damaged or malfunctioning controls and
equipment.
equipment.
2.
Train the Owner’s maintenance personnel on procedures and schedules related to start-up
and shutdown, troubleshooting, servicing, and preventive maintenance.
and shutdown, troubleshooting, servicing, and preventive maintenance.
3.
Review data in operation and maintenance manuals with the Owner’s personnel.
4.
Schedule training with the Owner, through the Architect/Engineer, with at least seven day’s
advanced notice.
advanced notice.
3.5 PROTECTION
A.
Provide final protection and maintain conditions in a manner acceptable to the Installer, that
shall ensure that the solid state UPS shall be without damage at time of Substantial Completion.
shall ensure that the solid state UPS shall be without damage at time of Substantial Completion.
3.6
UL 924 OPTION - EMERGENCY LIGHTING
A.
Offered for 40KVA, 50KVA, 80KVA and 100KVA models only. UPS and battery systems.
B.
90 minutes back-up time.
C.
Shielded test switch.
D.
Manually operated test switch. (Input switch Q1)
E.
All other features and characteristics are the same as the Galaxy 5000 UL 1778.
Rated power (KVA)
40 kVA
50 kVA
80 kVA
100 kVA
UPS system adjacent
SUG540A90UL
SUG550A90UL SUG580A90UL SUG5100A90UL
UPS system stand-
Alone
Alone
SUG540S90UL SUG550S90UL
SUG580S90UL
SUG5100S90UL
Number of battery
cabinets included
cabinets included
2 cabinets
2 cabinets
3 cabinets
4 cabinets
Battery Runtime meet
or exceed (min)
or exceed (min)
90
90 90 90
END OF SECTION