P1522
FIG. 7 MAIN ON/OFF SWITCH TERMINALS
BLK from Fuse Holder
BLK to Solenoid (Water)
Switch #2 AFPO-2 & 3
MAIN ON/OFF SWITCH
FIG. 6 MAIN ON/OFF SWITCH
P1516
Location:
 
The main ON/OFF switch is located on the lower 
right front of the autofill box just above the power 
cord.
Test Procedure:
1.  Disconnect  the  dispenser  from  the  power 
source.
2.  Disconnect  the black wire from the fuse holder 
and the white wire from pump #1.
3.  Connect the dispenser to the power source. Check 
for voltage across the black wire removed from 
the switch and the white wire removed from pump 
#1.  The indication must be:
 
a) 120 volts ac for 2 wire 120 volt models.
 
b) 200 to 240 volts ac for two wire 200 or 240 volt 
models.
 
c) 230 volts ac for two wire 230 volt models.
4.  Disconnect  the  dispenser  from  the  power 
source.
If voltage is present as described, proceed to #5.
If voltage is not present as described, refer to the Wiring 
Diagrams and check the dispenser wiring harness.
SERVICE (cont.)
5.  Check for continuity across the switch terminals 
with the switch in the “ON” position. Continuity 
must  not  be  present  when  the  switch  is  in  the 
“OFF” position.
If continuity is present as described, reconnect the 
wires to the switch terminals.
If continuity is not present as described, replace the 
switch.
Removal and Replacement:
1.  Remove the wires from the switch terminals.
2.  Compress  the  clips  inside  the  autofill  box  and 
gently push the switch through the opening
3.  Push the new switch into the opening and spread 
the clips to hold switch in the autofill box.
4.  Refer to Fig. 7 when reconnecting the wires.
41093 040408