Procom AL500HYLA Manual Do Utilizador

Página de 14
                            5                                                   AL058-01 
 
8.  Set the top panel in place on the columns and 
secure with M4 × 10 screws provided. Do not 
tighten at this time. (See FIG.8) 
 
12. From the outer side, use M5
× 10 screws to 
fasten the fixing hoop on the right and left support. 
Fasten the other side of the fixing hoop after the   
cylinder is in place.    (See FIG.11)
 
Note:  The installer must supply an external regulator 
with a hose (with 5/8” nut at one end, and a regulator 
at the other end) and a 20# Vertical Acme with OPD 
LP cylinder. 
1. Turn the door knob clockwise and open heater 
door. 
2. Remove dustproof wrap from regulator. 
3. Set cylinder flat on base compartment (See FIG.12) 
4. Connect regulator with cylinder. Tighten with care. 
Do not over-pressurize the valve. 
5. Before opening gas supply valve, make sure 
control knob is in the OFF position. Open gas 
supply valve. Apply a mixture of liquid soap and 
water to all joints. Do not use an open flame. 
Bubbles forming show a leak.  Check all 
connections for leaks immediately. 
9.  Attach the screens to columns with M4 × 10 
screws provided. Do not tighten at this time. (See 
FIG.9) 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
10. Tighten the screws of step 8,9,10 to finish 
installation. 
11. Attach the handle to the middle base with 2 hex 
head screws provided. (See FIG.10) 
Figure 8-Top panel installation 
Figure 9-Screens installation 
Figure 10-Handle installation 
Figure 11-The fixing hoop installation
Figure 12-Cylinder set and pipe
installation 
CONNECTING TO GAS SUPPLY