Enviro EG 33 Manual Do Utilizador

Página de 22
Place the unit into the framed opening. Nail or screw the unit to the framing using the nailing flanges provided. MAKE SURE 
THAT THE UNIT IS LEVEL AND PLUMB BEFORE NAILING OR SCREWING TO THE FRAMING MEMBERS. ALSO 
INSURE THAT THE BOTTOM OF THE UNIT IS LEVEL WITH THE FINISHED HEARTH HEIGHT. 
 
Once the unit has been secured, install all venting according to local codes and guidelines and restrictions applied in this 
manual. 
 
Install gas line from either the right or left side of the unit. Gas lines must be installed to meet local codes for the areas being 
installed. 
 
Hook up all electrical connections for the convection blower and remote wall switch or thermostat if supplied. 
 
The unit can now be enclosed with the rest of the house finishing. Place a sheet of drywall around the unit covering the nailing 
flanges and stopping on the unit body. Place the finished tile work or alternate facing material on top of the drywall so that the 
facing material does not extend past the nailing strip of the appliance. 
(see diagram provided) 
 
NOTE: The maximum thickness of any finished facing material around the unit is 1/2” (1.27 cm). 
 
Reinstall logs, glass door, decorative surround panel, door fascia and top louvers 
 
 
 
 
NAILING FLANGES 
LOCATED ON RIGHT SIDE, 
LEFT SIDE AND THE TOP 
OF UNIT. 
DRYWALL OR FINISHED 
WALL BOARD MATERIAL 
TILE OR FINISHED 
FIREPLACE SURROUND 
SECURING HOLES 
FOR SECURING THE 
APPLIANCE BEFORE 
FRAMING 
BEVELED DECORATIVE SURROUND PANEL
REMOVE THE FOUR SCREWS LOCATED 
BEHIND THE TOP AND BOTTOM LOUVERS 
AND REMOVE FROM THE STOVE 
 
6