Monogram ZVC30LSS Instrução De Instalação

Página de 24
12
Installation Preparation
TOOLS AND MATERIALS REQUIRED
(NOT SUPPLIED)
Pencil and tape measure
Wire cutter/stripper
Step ladder
Wire nuts
Phillips and flat blade
screwdrivers
Strain relief
Spirit level
Flashlight
Safety glasses
8
″ ducting and
caps as needed
Aluminized
duct tape
1/4
″ pivoting
hex socket
REMOVE THE PACKAGING
CAUTION: 
Wear gloves to protect 
against sharp edges.
ATTENTION : 
Portez des gants pour 
éviter les blessures causées par les tranchants.
CAUTION: 
LIFT THE INSERT SLEEVE 
OUT OF THE BOX BY GRASPING THE SIDES.
ATTENTION : 
SOULEVEZ LE 
MANCHON INTÉRIEUR DE LA BOÎTE EN SAISISSANT 
SES CÔTÉS.
1. Open hood carton.
2. Remove the liner, foam and cardboard.
3. Remove the tape securing the filters to the insert
sleeve, lift the tabs and remove the filters.
4. Unscrew the 5 nuts securing the damper vent
plate assembly, and remove it from the insert
sleeve. Set the 5 nuts and the damper vent plate
assembly aside, as you will be re-installing it later
in the installation process.
5. Remove the screws attaching the insert sleeve to
the mounting board. Discard the screws.
6. Grasp the insert sleeve by the outside edges, and
lift straight up and out of the carton.
NOTE: Do not lift the insert sleeve by the blower
motor.
7. Remove and properly discard the plastic wrapping.
8. Remove the parts box and other packaging.
Electric drill and
appropriate bits
1
″ conduit (for remote
mounting only)
Gloves
3/8
″ socket/
nut driver
Knife
Plumb line
Silicone
Needle-nose pliers
Tin snips