Monogram ZSC1001JSS Instrução De Instalação

Página de 12
Installation Preparation
PREPARE THE OPENING 
(CONT.)
Installation over a GE/Monogram  
Warming Drawer:
NOTE: Additional clearances between the cutouts 
may be required. Check to be sure the oven supports 
above the Warming Drawer location does not 
obstruct the required interior depth and height. See 
Warming Drawer installation instructions for details.
27” or 30”
23-1/2”
25-1/8”
17-1/2”
9-1/4”
36-3/4”
Min.
2” Min.
Install 2 x 
4 or 2 x 2 
Runners 
or Solid 
Bottom. 
Must 
Support 100 
lbs.
Construct  
Solid Bottom  
Min. 3/8” 
Plywood 
Supported  
by 2 x 4 or  
1 x 2 Runners 
all Four Sides
6
PREPARE THE OPENING
The Advantium 120 can be installed in combination 
with other GE/Monogram appliances. Always follow 
each product’s Installation Instructions to complete 
the installation.
Single Advantium 120 Installation:
Order a 27” or 30” wide single oven cabinet or cut 
the opening in a wall to the dimensions shown.
‡$OZD\VPDLQWDLQµPLQLPXPKHLJKWIURP
the floor to the cutout in any single or combined 
installation.
‡$OORZµFDVHWULPRYHUODSDWWKHWRSDQG
7/8” overlap on the bottom and each side of the 
opening.
‡2YHQRYHUODSVZLOOFRQFHDOFXWHGJHVRQDOOVLGHV
of the opening.
When installed over a single oven or a warming 
drawer, allow at least 2” between the two openings. 
This separation will provide clearance for bottom 
overlap of the Advantium 120 and the other 
appliance overlaps.
Construct a solid oven floor of 3/8” min. thick 
plywood supported by 2 x 4 runners on all sides.
‡7KHVXSSRUWPXVWEHOHYHODQGULJLGO\PRXQWHG
flush with the bottom edge of the cutout.
27” or 30”
23-1/2”
25-1/8”
17-1/2”
Construct  
Base  
Min. 3/8” 
Plywood 
Supported  
by 2 x 4  
or 1 x 2 
Runners all 
Four Sides
36-3/4”
Min.