3. Start-up
3.1. Ge ne ral
»
This chap ter is di rec ted at the ope ra tor of the equip ment.
This chap ter as su mes ge ne ral skills in dea ling with con vey ing
units and SPS con trol units.
This chap ter as su mes that the functio nal des crip ti on has been
read and un ders tood.
It should be en su red in each and every case that the ope ra tors
have the re le vant skills.
Ex plo si ve ga ses and mix tu res of gas and air must not be con -
vey ed  by  the  va cu um  ge ne ra tor.  So lid  par ti cles  and  dust  must
be  se pa ra ted  be fo re  en try  to  the  va cu um  ge ne ra tor.
F
Check the com pres sed air supp ly if pneu ma tic val ves are
pre sent (5-6 bar (72.52-87.02 PSI) sys tem over pres su re).
Check whet her the plas tic stop pers have been re mo ved from 
the  suc ti on  pipe  of  the  va cu um  ge ne ra tor.
Check that the on/off swit ch is in po si ti on ”OFF".
8
1
6-
4
M
S
Ge ne ral
Start-up  3-1