Tektronix 2200 Manual Do Utilizador

Página de 188
2-17
Installation
8. Place the pair of new black cables over the proper studs in the Primary 
and Redundant Power Supplies, routing the cables through the slot in 
the bottom of the Primary supply and the top of the Redundant supply. 
(The colors must match those of the existing cables.)
Figure 2-10.  Switcher Redundant Power Supply Installation
Black Cables 
from Switcher
Black Cables 
from Primary
Power Supply
Lock Washers
Studs
Lock
Washers
Hex 
Nuts
Route Cables
Down Through
Slot in Top of
Lower Chassis
Red Cables 
from Primary
Power Supply
Hex Nuts
Lock Washers
Tighten Captive
Screws to Upper
Chassis
(8 Places)
NOTE:
Always Insert Black Cables
In Slots Before Red Cables
If Present,
Remove 
Connector 
Cover Plate
From Primary 
Power Supply
If Present,
Remove Slot 
Cover Plate
From Primary 
Power Supply
Connector Cover Plate 
Should Remain on Bottom of 
Redundant Power Supply
Slot Cover Plate Should Remain on
Bottom of Redundant Power Supply
Primary 
Power Supply
Redundant
Power Supply
Switcher
Frame
Red Cables 
from Switcher