Section 2 — Installation
NOTE:  
The black cables must go in the slot before the red cables; the black cables 
are shorter than the red.
9. Secure the cables by placing a lock-washer and hex nut (removed 
earlier) over each end of the cables.
10. Similarly, place the pair of new red cables over the proper studs in the 
Primary and Redundant Power Supplies and secure the cables with 
lock washers and hex nuts.
11. Torque all four hex nuts to 80 inch pounds (6.7 foot pounds) (9 Newton 
meters). 
12. Route the loose cable harness connectors on the left side of the chassis 
up through the two holes at the top, and securely insert them into the 
connector sockets in the bottom of the primary power supply chassis. 
(The connectors are keyed for proper alignment.)
13. Check your work to ensure all connections are secure and safe.
14. Replace the rear panel access covers (left and right) on both the Primary 
and Redundant Power Supplies. 
Switcher Frame Modules 
The Model 2200 switcher is shipped fully configured with all the standard 
and ordered optional modules already installed in the switcher frame.
The frame is divided into two “bays,” one in front (A) and one in the rear 
(C). The modules slide into the frame bays, plugging into connectors 
attached to the main motherboard at the center of the frame. The correct 
location of each module is indicated on a location strip above the top of the 
bays. Refer to 
 and