Manual Do Utilizadoríndice analíticoInterReach picoBTS Installation and Commissioning Guide1TABLE OF CONTENTS7Chapter 1 - Unpacking and Configuration Verification131.1 Unpacking and Inspecting141.1.1 Unpacking and Inspecting the picoBTS141.2 Electrostatic Discharge (ESD)151.2.1 Identifying the System15Chapter 2 - Installation172.1 Analyzing Site Requirements182.1.1 Environmental Conditions182.1.2 Electrical Requirements182.1.3 Chassis Requirements202.2 Mounting the picoBTS Chassis212.2.1 Required Materials212.2.2 Rack Mount Advisory212.2.3 Installation Instructions222.3 Connecting the Grounding Cable242.4 Connecting the Power SupplY262.5 Connecting the Distributed Antenna System282.6 Network Connection302.7 Post Installation Cabling and Checks31Chapter 3 - Commissioning and Configuration333.1 Pre-Commissioning353.1.1 On-Site Visual Inspection353.2 Commissioning of the picoBTS363.2.1 Connecting the PC to the picoBTS Chassis363.2.2 Setting Up a Serial Connection to the picoBTS Serial Port363.2.3 Power On LED Tests383.3 Configuring THE ethernet address and boot Parameters403.4 Software Verification433.4.1 Verifying the Current Software Version and Patch Level433.4.2 Verifying the Software License443.4.3 Rebooting the picoBTS443.4.4 Terminating Serial Communications with the picoBTS453.5 Preparing for On-Line CommissioninG45Chapter 4 - On-Line Testing474.1 Pre On-Line Commissioning Requirements484.2 On-Line Commissioning494.2.1 Testing the picoBTS514.2.2 Recovery Tests514.2.3 TCH Timeslot Tests514.2.4 RX Signal Quality Measurements524.3 Post On-Line Commissioning Procedures54Tamanho: 4 MBPáginas: 58Language: EnglishAbrir o manual