14
American Dryer Corp.
113243-1
2SHUDWLQJ6WHDP3UHVVXUH
0D[LPXP
SVLJ
N3D
+HDW,QSXW1RUPDO/RDG
%KS
&RQVXPSWLRQ$SSUR[LPDWH
OEVKU
NJKU
IMPORTANT:
Coil failure due to improper pH level will VOID
THE WARRANTY.
Steam  Requirements
Shaded areas are stated in metric equivalents
* The  minimum  operating  pressure  is  100  psig  (689.47  kPa)  for  optimum
fresults.
Installation  Instructions
To ensure an adequate supply of steam is provided, be sure
that the steam supply lines and steam return lines are sized
and laid out as stipulated in this manual.  Inadequate steam
supply  lines  and  steam  return  lines  or  improper  steam
plumbing  will  result  in  poor  performance  and  can  cause
component  failure.    Clean,  dry  steam  must  be  provided  to
the dryer.
IMPORTANT:
Steam coil failure due to water hammer by wet
steam will VOID THE WARRANTY.
The pressure of the condensate in the steam supply line will
cause  water  hammer  and  subsequent  heat  exchanger
(steam  coil)  failure.    The  steam  supply  connection  into  the
main  supply  line  must  be  made  with  a  minimum  10-inch
(25.4 cm) riser.  This will prevent any condensate from draining
towards the dryer.
The  steam  supply  line  to  the  dryer  must  include  a  12-inch
(30.48 cm) riser along with a drip trap and check valve.  This
will prevent any condensate from entering the steam coil.
Flexible hoses or couplings must be used.  The dryer vibrates
slightly  when  it  runs  and  this  will  cause  the  steam  coil
connections to crack if they are hard piped to the supply and
return  mains.
Shutoff valves for each dryer should be installed in the supply
line, return line, and drip trap return line.  This will allow the
dryer to be isolated from the supply main and the return main
if the dryer needs maintenance work.
Install an inverted bucket steam trap and check valve at least
12-inches  (30.48  cm)  below  the  steam  coil  as  close  to  the
coil as possible.  A trap with a capacity of 150 lbs (68 kg) of
condensate per hour at 125 psi (8.62 bar) is needed for each
unit.
The supply line and the return line should be insulated.  This
will save energy and provide for the safety of the operator and
maintenance  personnel.
Water pockets in the supply line, caused by low points, will
provide  wet  steam  to  the  coil  possibly  causing  steam  coil
damage.  ALL horizontal runs of steam supply piping should
be pitched 1/4-inch (6.35 mm) for every 1 foot (0.31 meters)
back  towards  the  steam  supply  header  causing  the
condensate in the line to drain to the header.  Install a bypass
trap in any low point to eliminate wet steam.
IMPORTANT:
Flexible hoses/couplings must be used.  Coil
failure due to hard plumbing connections will
VOID THE WARRANTY.
!
!
!