Справочник Пользователя для State Industries SW 37-670

Скачать
Страница из 20
10
requIred aBIlIty
Installation and service of this boiler requires ability equivalent to that 
of a qualified agency (page 2) in the field involved. Plumbing and 
electrical work is required.
General
The  installation  must  conform  with  these  instructions  and  the 
local  code  authority  having  jurisdiction  and  the  requirements  of 
the power company. In the absence of code requirements, follow 
NFPA-70  (current  edition).  In  the  absence  of  local  codes,  the 
installation  must  comply  with  the  latest  editions  of  the  National 
Electrical  Code,  NFPA  70  or  the  Canadian  Electrical  Code  CSA 
C22.1.  The  National  Electrical  Code  may  be  ordered  from: 
National Fire Protection Association, 1 Batterymarch Park, Quincy, 
MA  02269.  The  Canadian  Electrical  Code  is  available  from  the 
Canadian Standards Association, 8501 East Pleasant Valley Road, 
Cleveland, OH 44131.
Do 
not  test  electrical  system  before  boiler  is  filled  with  water, 
follow the START UP procedure in the OPERATION section of this 
manual.
The principal components of the boiler are identified in the Features 
and Components illustration on page 8.
Boilers are usually placed in a series with the heating system on 
the outlet side of the circulating pump. The boiler piping should 
include inlet and outlet water valves to permit maintenance and 
service  work  to  be  performed  without  disturbing  the  rest  of  the 
system.
Detailed system installation drawings are normally provided by the 
equipment purchaser or system designer.
pressure relIef ValVe
An ASME rated pressure relief valve is furnished with the boiler. A 
fitting for the relief valve is provided in the top of the boiler. Never 
operate the heating elements without being certain the boiler is filled 
with water and a properly sized pressure relief valve is installed in 
the relief valve opening provided.
The  pressure  rating  of  the  relief  valve  should  be  equal  to  or  less 
than the rated pressure capacity of any component in the system 
including the boiler. Should the valve need to be replaced, call the 
toll free phone number listed on the back of this manual for further 
technical assistance.
A  discharge  pipe  from  the  relief  valve  should  terminate  at  an 
adequate  floor  drain.  Do  not  thread,  plug,  or  cap  the  end  of  the 
drain line.
The Discharge Pipe:
•  Shall not be smaller in size than the outlet pipe size of the valve, 
or have any reducing couplings or other restrictions.
•  Shall not be plugged or blocked.
•  Shall not be exposed to freezing temperatures.
•  Shall be of material listed for hot water distribution.
•  Shall  be  installed  so  as  to  allow  complete  drainage  of  both  the 
relief valve and the discharge pipe.
•  Must terminate a maximum of six inches above a floor drain or 
external to the building. In cold climates, it is recommended that 
the discharge pipe be terminated at an adequate drain inside the 
building.
•  Shall not have any valve or other obstruction between the relief 
valve and the drain.
Once the boiler is installed and filled with water and the system is 
pressurized, manually test the operation of the pressure relief valve. 
See the maintenance section of this manual forinstructions.
water lIne connectIons
The boiler may be installed by itself, or with a separate storage tank, 
on both single and two-temperature systems. When used with a 
separate storage tank, the circulation may be either by gravity or 
by means of a circulating pump. When a circulating pump is used 
it is important to note that the flow rate should be slow so that there 
will be a minimum of turbulence inside the heater.
InstallatIon