MLT20 seRIes LIgHT TOWeR • OpeRaTIOn ManuaL — Rev. #0 (01/18/13) — page 23
MaintenanCe
seRvICIng THe  MasT  exTensIOn  CaBLe 
sYsTeM
To replace the cable in the mast extension cable system, 
use the following steps (See Figure 12):
Figure 12. Mast Extension Cable System
1.  Lower the mast to the horizontal resting position.
2.  Inspect the cable clamps, pulleys, and other components 
for worn or damaged parts. If either of the cables on 
the mast needs to be replaced, they should both be 
replaced at the same time.
3.  Disassemble  the  mast  by  disconnecting  the  cables 
from the mast and sliding the sections apart. The lower 
cable can be disconnected from the winch.
CENTER
MAST
PULLEY
ROUTE TO
HAND WINCH
LOWER
MAST
PULLEY
UPPER
MAST
CENTER
MAST
LOWER
MAST
LOWER
MAST
SHACKLE
  WaRnIng
The mast sections are heavy and awkward to handle. 
Use  proper  lifting  devices  and  procedures  when 
servicing the mast and its components.
4.  There are two pulleys in the mast raise/lower cable 
system. They should be removed and replaced if worn 
or  damaged. Worn  or  damaged  pulleys  can  cause 
premature cable failure.
5.  Reassemble  the  mast  extension  cable  system  by 
connecting the cable to the bottom of the upper mast 
and  sliding  the  upper  mast  into  the  opening  of  the 
center mast. Connect the second cable to the bottom 
of the center mast and slide the center mast into the 
opening  of  the  lower  mast,  observing  proper  lifting 
techniques.
6.  Route the upper mast cable through the center mast 
pulley and connect the free end of the cable to the 
lower  mast  ankle  shackle.  Route  the  center  mast 
cable through the lower mast pulley and connect the 
free end of the cable to the hand winch at the bottom 
of the lower mast.
7.  Raise, extend, retract and lower the mast several times 