Vertical termination installation
1.  Determine the location for the termination(s).
note: The standard vent and intake air terminations are of 
2.  if installing only the vent (exhaust) piping in a Power Vent 
configuration  vertically  through  the  roof;  ensure  that  all 
exterior  vertical  clearance  requirements  shown  in  Figure 
23 and Figure 24 on page 28 are being maintained. These 
clearances and those cited by local and national codes must 
be maintained.
note: On flat roof installations the vent termination must be 
a minimum of 24 inches (60 cm) above any parapet, vertical 
wall or structure within 10 feet (3 m) horizontally. See Figure 
3.  if installing both intake air and vent piping in a Direct Vent 
configuration  vertically  through  the  roof;  ensure  that  all 
exterior  vertical  clearance  requirements  shown  in  Figure 
23 and Figure 24 on page 28 are being maintained. These 
clearances and those cited by local and national codes must 
be maintained.
note: On flat roof installations the intake air and the vent 
terminations must be a minimum of 24 inches (60 cm) above 
any  parapet,  vertical  wall  or  structure  within  10  feet  (3  m) 
4.  if  installing  only  vent  piping  in  a  Power  Vent  configuration 
vertically through the roof the following instructions must be 
followed:
The vent termination must be oriented facing downward as 
shown in Figure 23 and Figure 24 on page 28.
The bottom edge of the vent termination must be a minimum 
of 12 inches (30 cm), 18 inches (45 cm) in Canada, above 
the average or expected snow level as shown in Figure 23 
5.  if installing both intake air and vent piping in a Direct Vent 
configuration  vertically  through  the  roof  the  following 
instructions must be followed:
The intake air and vent pipes must penetrate the same side 
of the roof as shown in Figure 25 on page 28.
The intake air and vent terminations must be oriented facing 
downward and in the same direction as shown in Figure 25 
The intake air and vent terminations must have a minimum 
separation of 24” (61 cm) measured on center line as shown 
in Figure 25 on page 28. in colder climates this separation 
should be increased to at least 48 inches (122 cm).
The  bottom  edge  of  the  intake  air  and  vent  terminations 
must be a minimum of 12 inches (30 cm), 18 inches (45 cm) 
in  Canada,  above  the  average  or  expected  snow  level  as 
6.  When  the  intake  air  and/or  vent  piping  from  multiple 
water  heaters  will  terminate  in  the  same  location  the  vent 
terminations  can  be  grouped  together  in  close  proximity  0 
inches/touching. intake air terminations can also be grouped 
together in close proximity 0 inches/touching. 
The  distance  between  the  closest  vent  and  intake  air 
terminations  must  be  a  minimum  of  24  inches  (61  cm) 
as shown in Figure 25 on page 28. in colder climates this 
separation  should  be  increased  to  at  least  48  inches  (122 
cm).
7.  Cut a 4 inch (10 cm) diameter hole for 3 inch pipe or 5 inch 
(13 cm) diameter hole for 4 inch pipe where the pipe(s) will 
pass through the roof.
note: Beware of concealed wiring and piping when cutting 
through the roof.
8.  Suspend  the  pipe(s)  through  center  of  hole  using  field 
supplied metal strapping or equivalent support materials as 
9.  Slide  a  roof  boot  or  equivalent  flashing  over  the  pipe  and 
secure  roof  boot  or  equivalent  flashing  to  roof  and  seal 
around  the  flashing  as  shown  in  Figure  23,  Figure  24  and 
10. install the factory supplied intake air and/or vent termination(s) 
using  field  supplied  pipe  and  one  field  supplied  90°  elbow 
as shown in Figure 23 on page 28. The short section of pipe 
that connects between the field supplied 90° elbow and the 
factory supplied termination must not be excessive in length. 
The  exposed  portion  of  this  pipe  shall  be  no  more  than  2 
installation on page 25 to complete the installation of the intake 
air  and/or  vent  piping  between  the  termination(s)  and  the 
water heater.
STANDARD FACTORY SUPPLIED TERMINATIONS
INTAKE AIR TERMINATION
45° ELBOW WITH
DOME SHAPED DEBRIS
SCREEN
VENT TERMINATION
45° ELBOW WITH
RECESSED DEBRIS
SCREEN
figure 22