Справочник Пользователя для Lucent Technologies Release 6

Скачать
Страница из 453
DEFINITY Enterprise Communications Server Release 6
Installation and Test for Multi-Carrier Cabinets  
555-230-112  
Issue 5
May 1998
Cable Ductwork 
Page C-13
 
C
Figure C-8.
Install Cross-Aisle I/O Ductwork or I/O Cross-Aisle to Wall 
Trough
NOTE
:
If wall trough is being installed, locally provided hardware is required at wall 
end of duct.
Figure Notes
1. I/O Trough
2. Use Only When Required
3. Cross-Aisle Brackets
4. I/O Endplate
5. Cross-Aisle I/O Trough or I/O Wall Trough
6. Front of Cabinet
duct3 KLC 071796