Справочник Пользователя для Lucent Technologies R5SI

Скачать
Страница из 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-647
ETR-PT (Enhanced Tone Receiver Port) 
10
at a time when it is convenient to remove a clock board from the system. 
Follow the procedures described in the TONE-BD section for replacing a 
tone/clock circuit pack.
System Technician-Demanded Tests: 
Descriptions and Error Codes
Always investigate tests in the order presented in the following tables when 
inspecting errors in the system. By clearing error codes associated with the 
Tone 
Detection Verification Test
, for example, you may also clear errors generated 
from other tests in the testing sequence.
Tone Detection Verification Test (#42)
This test checks out a single ETR port in the touch-tone receiver mode MFC tone 
detection/generation mode and general purpose tone detection mode. During 
the first portion of the test, the touch-tone receiver mode is tested. Then general 
purpose call progress and maintenance tones are tested and lastly MFC tones 
are tested.
1.
D = Destructive; ND = Nondestructive
Order of Investigation
Short 
Test 
Sequence
Long Test 
Sequence
D/ND
1
Tone Detection Verification Test (#42)
X
X
ND
Tone Detection Audit/Update Test (#43)
X
X
ND
Table 10-187.
TEST #42 Tone Detection Verification Test 
Error 
Code
Test 
Result
Description/ Recommendation
none
ABORT
The system was not able to allocate all the resources 
needed for this test OR there was an Internal System 
Error.
1
ABORT
The system could not allocate all the resources needed 
to test the tones.
1001
ABORT
The system was unable to put the ETR-PT in the 
appropriate mode to test it.
Continued on next page