Справочник Пользователя для Lucent Technologies R5SI
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Object Repair Procedures
Page 10-1149
PR-MAINT (Maintenance Processor [TN790 RISC Systems])
10
MTP Auxiliary Loop Around Test (#229)
This test is a nondestructive test. The test places the Auxiliary channel of the MTP
into a loop around mode, and it verifies the data integrity of the channel. The
Auxiliary channel is used as the CDR output port
into a loop around mode, and it verifies the data integrity of the channel. The
Auxiliary channel is used as the CDR output port
Table 10-341.
TEST #228 MTP SAT Loop Around Test
Error
Code
Code
Test
Result
Description/ Recommendation
100
ABORT
The test did not complete within the allowable time period.
1. Retry the command.
1000
ABORT
System software resources required for this test are not available.
1029
2014
2015
2016
2017
2018
2020
2022
2024
2025
2051
2014
2015
2016
2017
2018
2020
2022
2024
2025
2051
ABORT
Refer to “STBY-SPE” for a description of these error codes.
2000
ABORT
The response to the test request was not received within the allowable
time period.
time period.
2033
2034
2034
ABORT
Internal system error
1. Retry at 1-minute intervals a maximum of 5 times.
FAIL
The SAT channel failed the Loop Back Test. The SAT is probably unusable
for administration or maintenance. The EPN SAT, if available, or remote
access can still be used.
for administration or maintenance. The EPN SAT, if available, or remote
access can still be used.
1. Retry at 1-minute intervals a maximum of 5 times.
2. If the test continues to fail, replace the Processor circuit pack.
PASS
The SAT channel passed the Loop Back Test.
1. If the PPN SAT is not usable, check the SAT itself, along with the
cabling.
Continued on next page