Справочник Пользователя для Lucent Technologies R5SI
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si
Maintenance and Test for R5vs/si
555-230-123
Issue 1
April 1997
Maintenance Commands and Trouble-Clearing Aids
Page 8-470
status link
8
Error Messages
If the specified link number is invalid, the following message is displayed:
Link out of range, please press HELP
If the specified link number is not administered, the following message is
displayed:
displayed:
Link not administered
If during the execution of a command a resource problem occurs that requires
the user to restart the command, then the following message is displayed:
the user to restart the command, then the following message is displayed:
Command resources busy;
Press CANCEL to clear, and then resubmit
If all of the available maintenance resources are currently in use, then the
following message is displayed:
following message is displayed:
All maintenance resources busy; try again later
DEFINITIONS
Link
A synchronous connection between the Definity system and an
adjunct or another switch. The link consists of three protocol
levels. The entire link is identified by a link number which is
specified on the "change communications-interface links" form.
adjunct or another switch. The link consists of three protocol
levels. The entire link is identified by a link number which is
specified on the "change communications-interface links" form.
Level 1
Physical connection of a port on a Processor Interface board to
hardware which serves the same purpose on the adjunct or switch
(for example, a PI board or an SCP board on Audix). There can be
several components between these two endpoints (modems, DS1
facilities, cables, and so forth).
hardware which serves the same purpose on the adjunct or switch
(for example, a PI board or an SCP board on Audix). There can be
several components between these two endpoints (modems, DS1
facilities, cables, and so forth).