Справочник Пользователя для Lucent Technologies R5SI

Скачать
Страница из 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Initialization and Recovery 
Page 4-6
Reset System 5 (System Reboot and Run All 24-Hour Tests) 
4
The boot image is already in the flash ROM memory. The system reboots 
immediately after the LMM performs a series of diagnostics on the processor and 
memory. Translations reload from the translation card. Depending on the 
translation, the reloading process takes from five to 30 seconds. Thereafter, all 
port circuit packs are reset, and all telephone sessions drop. Telephones begin 
to reconnect to the switch within 30 seconds. In a large system, reconnection of 
all telephones may take up to five minutes. Finally, scheduled maintenance is 
initiated. Typical displays in a Release 5vs/si system follow:
Typical Display (TN790 Release 5 and Later)
INTERNAL REGISTER TEST
PASSED
LOCAL BUS TEST
PASSED
ROM CHECKSUM TEST
PASSED
CONTROL STATUS TEST
PASSED
DCACHE TEST
PASSED
ICACHE TEST
PASSED
WRITE BUFFER TEST
PASSED
BTO TEST
PASSED
MEM CONFIG TEST
PASSED
MEMORY FUNCTIONAL TEST
PASSED
MEMORY MODULE A STUCK BIT TEST
PASSED
MEMORY MODULE A PARITY TEST
PASSED
MEMORY MODULE A BURST TEST
PASSED
MEMORY MODULE A COUPLE TEST
PASSED
MEMORY MODULE B STUCK BIT TEST
PASSED
MEMORY MODULE B PARITY TEST
PASSED
MEMORY MODULE B BURST TEST
PASSED
MEMORY MODULE B COUPLE TEST
PASSED
MEMORY MODULE C STUCK BIT TEST
PASSED
MEMORY MODULE C PARITY TEST
PASSED
MEMORY MODULE C BURST TEST
PASSED
MEMORY MODULE C COUPLE TEST
PASSED
VIRTUAL MEMORY TEST
PASSED
Continued on next page