Справочник Пользователя для Mitsubishi Electronics QD75MH2

Скачать
Страница из 838
 
 
 
6 - 62 
MELSEC-Q
 
6   PLC PROGRAM USED FOR POSITIONING CONTROL 
 
 Position control operation timing and process time 
 
t1
t2
t3
t4
t5
t2
t6
Cd. 7 M code OFF request
Waiting
Controlling position
Waiting
BUSY signal
Positioning operation
Md. 26  Axis operation status  
Cd. 7  M code OFF request
Positioning start signal
[Y10, Y11, Y12, Y13]
[XC, XD, XE, XF]
M code ON signal 
(WITH mode) [X4, X5, X6, X7]
Positioning start complete 
signal
[X10, X11, X12, X13]
M code ON signal
(AFTER mode)
[X4, X5, X6, X7]
[X14, X15, X16, X17]
Positioning complete signal
OPR complete flag 
[ Md. 31 Status: b4]
 
 
Fig. 6.10 Position control operation timing and process time 
 
•  When the positioning start signal turns ON, if all signals marked with an 
asterisk ( ) are already ON, the signals marked with an asterisk ( ) will turn 
OFF when the positioning start signal turns ON. 
 
 
Normal timing time                                                                      Unit: ms 
 
t1 t2 t3 t4 t5 t6 
1.2 to 2.0 
0 to 2.0 
0 to 1.7 
3.5 to 4.6 
0 to 1.0 
Follows 
parameters 
 
 The t1 timing time could be delayed depending on the operating conditions of 
the other axis.