Справочник Пользователя для Mitsubishi Electronics QD75MH2

Скачать
Страница из 838
 
 
 
11 - 19 
MELSEC-Q
 
11   MANUAL CONTROL 
 
 Inching operation timing and processing times 
 
The following drawing shows the details of the inching operation timing and 
processing time. 
 
Reverse run JOG start signal
[Y9,YB,YD,YF]
BUSY signal
[XC,XD,XE,XF]
Forward run JOG start signal
[Y8,YA,YC,YE]
ON
Standing by
Inching operation
Axis operation
status
t1
t4
Positioning operation
Positioning complete
signal
[X14,X15,X16,X17]
Md.26
ON
ON
OFF
OFF
OFF
OFF
t3
Standing by
t2
 
Fig. 11.13 Inching operation timing and processing times  
 
Normal timing times                                           Unit : ms 
 
t1 t2 t3 t4 
1.0 to 2.8 
3.1 to 3.3 
0 to 3.5 
Depending on 
parameters 
 
 Depending on the operating statuses of the other axes, delay may occur in the 
t1 timing time.