Chapter 2  Installation      21 
ACTURA Flex 48330
 
Power System  User Manual 
 Note 
1. The cable should not be spliced. The load cable, signal cable and AC cables should be 
wired separately as possible to avoid them affecting each other. 
2. If the power supply system is in operation, switch off the DC output MCB before 
connecting the cables. 
3. The rated current of the output cable should be bigger than that of the corresponding 
MCB connected with it. 
 
DC output branch should match the load capacity. It is highly recommended to 
connect priority load to BLVD branch, and normal load to LLVD branch. 
2.3.3  Connection Of Communication Cables 
There is a connector board in the rectifier shelf. The board is shown in Figure 2-12: 
 
 
J10
 
J11
 
Ethernet Port
 
Figure 2-12    Connector board in rectifier shelf 
There is an Ethernet port and a DB9 RS232 port on the front panel. For the 
connection of communication cables, first connect the Ethernet port to the 
transmission equipment, and then connect the DB9 RS232 port to the Main 
Computer.