Connection of the Loads 
In order to ensure the safety of personnel during installation work, 
make sure that the connections are made under the following 
conditions: 
♦  No mains voltage present. 
♦  The loads are switched off. 
♦  UPS is switched off (display completely blank). 
To disconnect the PROTECT 1., carry out the following steps: 
♦  Place the “maintenance switch” manual bypass on 
the back of the UPS in the “bypass” position. For 
this purpose, first remove the 4 screws of the cover 
(no.
 
3, p. 27/28). 
♦  Put the mains input miniature circuit breaker (no.
 
2, p. 
27/28) to the “OFF” position. 
Connect the loads as follows (terminals 1.3, p. 27/28): 
Connect the UPS terminals     /
 
PE =
 
ground, N = neutral 
conductor, L = phase that are marked with “OUTPUT” with the 
corresponding terminals of your UPS subdistribution. 
5.4 
Connection of External Battery Modules 
The PROTECT 1. requires the use of at least one external 
battery module. Two preconfigured battery cubicle types are 
available. Both versions guarantee an increase in the attainable 
standby time due to their parallel connection capability (see 
also chapter 2.3). 
 
 
PROTECT 1.100 
PROTECT 1.150 
PROTECT 1.200 
PROTECT 
1.100 BP 
   
 
PROTECT 
1.BP20 
   
 
 
 
The two cubicle types are distinguished in the following. Follow 
5.4.1 if you use the PROTECT 1.100 BP or 5.4.2 when using 
the PROTECT 1.BP20. 
No 
mix !