Справочник Пользователя для AEG Protect 1.150

Скачать
Страница из 64
 
 
54 
  Parallel Operation 
9.1 
Principle of Operation 
PROTECT 1. has been designed for parallel operation with n+x 
technology (“n” here stands for the number of units required for 
load supply, “x” for the degree of redundancy). Up to 3 units of 
the same type can be connected in parallel here to increase the 
output power and/or achieve higher availability. 
 
 
NS Hauptverteilung 
MI main distribution 
USV Einspeisung 
UPS feed 
Parallelfeld / Handumgehung plus USV 
Unterverteilung 
Parallel field / manual bypass plus UPS 
subdistribution