Справочник Пользователя для Sun Microsystems 816-0830-12

Скачать
Страница из 236
50
Sun StorEdge Network FC Switch-8 and Switch-16 Installation and Configuration Guide • October 2001
FIGURE 4-7
Installing the Vent Panel for a 16-Port Switch
Connecting the Cables
Some storage cabinets may have shorter and fewer power cords. In these cases, you
must use the Y cable, provided with your switch, to increase the number of power
connections and provide adequate power cord length. Install the Y cables only in the
J8 or J12 connections of the power sequencer.