Справочник Пользователя для Sun Microsystems 816-0830-12

Скачать
Страница из 236
Chapter 4
Hardware Installation
51
Sun StorEdge A5200 and T3 Arrays
To Connect the Cables to a Sun StorEdge
T3 Array
1. Power off the system.
For instructions about powering off the Sun StorEdge T3 Array, refer to the
documentation that came with the array.
2. Unplug the power cord from both fan trays and from the J12 connections on both
sequencers.
See
for the J12 location.
FIGURE 4-8
Power Sequencer
3. From the back of the cabinet, follow the route of the existing cables to the sides
and up the rear of the cabinet, to the level of the switches.
The Y cable on the back sequencer routes up the right side. The Y cable on the front
sequencer routes up the left side. Use tie wraps as necessary to secure the cables.
4. Connect the Y cable on the right side to the right side of the fan tray and the right
side of number 8, T3.
5. Connect the Y cable on the left side to the left side of the fan tray and the left side
of number 8, T3.
6. Connect the existing R8 cable to the lowest switch.
7. Connect the existing L8 cable to the highest switch.
J12
J8