Справочник Пользователя для APW Wyott M2000

Скачать
Страница из 12
TABLE OF CONTENTS
Safety Precautions 
2
General Information
2
Installation 
3
Location 
4
Operating Instructions  
4
Cleaning 
5
Troubleshooting Guide
Replacement Parts List w/Exploded View
Wiring Diagram
10 
Warranty 
12
SAFETY PRECAUTIONS
APW Wyott toasters are designed, built, and sold for commercial use and should be operated by trained 
personnel  only.  Clearly  post  all  CAUTIONS,  WARNINGS  and  operating  instructions  near  each  unit  to 
insure proper operation and to reduce the chance of personal injury and/or equipment damage.
Always disconnect power before cleaning or servicing the toaster. Surfaces will remain hot after power has 
been turned off, allow unit to cool before cleaning or servicing. Never clean the toaster by immersing it in 
water. The toaster is not protected against water jets; DO NOT CLEAN TOASTER WITH A WATER JET. 
Always clean equipment before first use.
Operating toaster without legs will void the warranty. Insure all accessories and exterior panels are properly
installed and adjusted before applying power and operating.
GENERAL INFORMATION
Check the rating label for your model designation and electrical rating. Rating Label is located on the 
bottom front of the control panel.
Overall dimensions with feeder: 23.5"(59.7cm) W x 25.9"(65.8cm) H x 17.5"(44.5cm) D
Electrical Ratings:
M2KA: 208VAC, 2880W, 13.8A, 60Hz
M2KH: 240VAC, 3840W, 16A, 60Hz
Cordset Configuration:
208/250V: NEMA 6-20P Plug, 4 foot, 3 wire grounded cord.
If the supply cord is damaged, the manufacturer or an authorized service agent or a similarly qualified 
person must replace it to avoid a hazard or warranty.
Shipping Weight:
94 lbs (42.7 Kg)
2
 
 
 
!
  
!
WARNING: 
In Europe, appliance must be connected by an earthing cable to all other units 
in the complete installation and thence to an independent earth connection in compliance 
with EN 60335-1 and/or local codes
  
 
 
 
!
 
!
WARNING:  An  earthing  cable  must  connect  the  appliance  to  all  other  units  in  the  complete 
installation and from there to an independent earth connection.