3. Remote Contacts/Ice Level Input — Termination of compressor operation occurs when ICE 
BUILD TERMINATION is set to CONTACTS ONLY OPTION and the remote contacts are 
open. In this case, the contacts are provided for ice level termination control. The remote 
contacts can still be opened and closed to start and stop the chiller when the Ice Build Time 
Schedule is UNOCCUPIED. The contacts are used to stop the ICE BUILD mode when the 
Ice Build Time Schedule is OCCUPIED. 
4. ECW TEMPERATURE and Remote Contacts — Termination of compressor operation shall 
occur when ICE BUILD TERMINATION is set to BOTH (temperature and contacts) option 
and the previously described conditions for ECW TEMPERATURE and remote contacts 
have occurred. 
Note: Overriding the CHILLER START/STOP, WATER/BRINE CONTROL POINT, and 
ACTIVE DEMAND LIMIT variables by CCN devices (with a priority less than 4) during 
the ice build period is not possible. However, overriding can be accomplished with CCN 
during two chiller lead/lag.
Return to Non-Ice Build Operations 
Upon termination of ice build, the machine shall return to normal temperature control and 
start/stop schedule operation. If the CHILLER START/STOP or WATER/BRINE CONTROL 
POINT has been forced (with a priority less than 4), prior to entering ice build operation, then 
chiller START/STOP and WATER/BRINE CONTROL POINT forces will be removed.