Справочник Пользователя для Carrier 17/19EX

Скачать
Страница из 437
Hot Alignment Check for Open-Drive Machines
Alignment of compressor with heat exchangers, gear, and driver may be affected by the 
operating temperatures of the various components. When all machine components have 
reached operating temperature (after running near full load for 4 to 8 hours), make a hot 
alignment check.
With the proper equipment and procedure, hot check can be made with either assembled or 
disassembled couplings. The procedures are detailed in the Maintenance section. 
A clamping tool, Part No. TS-170, is available for checking alignment without disassembling 
the couplings. Check with your local Carrier representative.
Doweling for Open-Drive Machines
The size, quantity, and location of dowels vary considerably with type and arrangement of 
gear and drive. Check your job data for specific doweling instructions. Typical doweling 
practices are described in the 
 section.
Never operate compressor or drive with coupling guards removed. Serious injury 
can result from contact with rotating equipment.
WARNING
!
WARNING