6.5.5
Pressure test
Do not conduct a pressure test. Deterioration may occur.
6.5.6
Daily and periodic inspection
Area of 
Inspection
Inspection 
Item
Description
Interval
Method
Criterion
Instrument
C
u
sto
m
er
’s
ch
eck
Daily
Periodic*
1 ye
ar
2 ye
ar
s
General
Surrounding 
environment
Check ambient 
temperature, humidity, 
dust, dirt, etc.
"
Measure 5cm away from 
the inverter.
(Refer to page 6.)
Ambient 
temperature: -10°C 
to +50°C , non-
freezing.
Ambient humidity: 
90% or less, non-
condensing.
Therm om eter, 
hygrom eter, 
recorder
Overall unit
Check for unusual 
vibration and noise.
"
Visual and auditory 
checks.
No fault.
Power supply 
voltage
Check that the main 
circuit voltages are 
normal.
"
Measure voltages 
across the inverter 
terminal block R, S and 
T phases.
Within permissible 
AC (DC) voltage 
fluctuation (refer to 
page 99)
Tester, digital 
multimeter
Main circuit
General
(1) Check with megger 
(across main circuit 
terminals and earth 
(ground) terminal).
(2) Check for loose 
screws and bolts.
(3) Check for overheat 
traces on the parts.
(4) Clean.
"
"
"
"
(1) Disconnect all cables 
from the inverter and 
measure across 
terminals R, S, T, U, 
V, W and earth 
terminal with 
megger.
(2) Retighten.
(3) Visual check.
(1) 5M
Ω
 or more.
(2), (3) No fault.
500VDC 
class megger
Conductors, 
cables
(1) Check conductors 
for distortion.
(2) Check cable 
sheaths for 
breakage.
"
"
(1), (2) Visual check.
(1), (2) No fault.
Terminal block Check for damage.
"
Visual check
No fault
Relay
(1) Check for chatter 
during operation.
(2) Check for rough 
surface on contacts.
"
"
(1) Auditory check.
(2) Visual check.
(1), (2) No fault.
Resistor
(1) Check for crack in 
resistor insulation.
(2) Check for open 
cable.
"
"
(1) Visual check. 
Cement resistance, 
wire-wound resistor.
(2) Disconnect one end 
and measure with 
tester.
(1) No fault.
(2) Indication
Control cir-
cuit
Protective 
circuit
Operation 
check
(1) Check balance of 
output voltages 
across phases with 
the inverter 
operated alone.
(2) Perform sequence 
protective operation 
test to ensure no 
fault in protective 
and display circuits.
"
"
(1) Measure voltages 
across the inverter 
output terminals U-
V-W.
(2) Simulatively short or 
open the protective 
circuit output 
terminals of the 
inverter.
(1) Phase-to-phase 
voltage balance 
within 4V (8V) for  
200V (400V).
(2) Fault must occur 
because of 
sequence.
Digital 
multimeter, 
rectifier type 
voltmeter
Cooling 
system
Cooling fan
(1) Check for unusual 
vibration and noise.
(2) Check for loose 
connection.
"
"
"
"
(1) Turn by hand with 
power off.
(2) Visual check.
No unusual vibration 
and noise.