72-Inch Cabinet Site Preparation  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1-12
Command Module and Drive Module Site Preparation Guide
Site Wiring
The cabinet’s AC power distribution boxes use common industrial wiring. Consider the 
following information when preparing the cabinet installation site:
AC power source – The AC power source must provide the correct voltage, current, and 
frequency specified on the manufacturer’s nameplate.
Earth ground – You must have an earth grounding conductor to the cabinet’s power 
receptacles.
Circuit overloading – Ensure the power circuits and associated circuit breakers provide 
sufficient power and overload protection. To prevent possible damage to the AC power 
distribution boxes and other components in the cabinet, use an external, independent 
power source which is isolated from large switching loads (such as air conditioning 
motors, elevator motors, and factory loads).
Module power distribution – There are two accessory outlets inside the cabinet for 
module power distribution. All units attached to these outlets must be auto-ranging 
between 180 through 257 VAC, 50-60 Hz.
Power interruptions – The cabinet and its modules will withstand the following 
applied voltage interruptions (with or without an integrated UPS):
Input transient – 50% of nominal voltage
Duration – one half cycle
Maximum frequency  once every ten seconds
Power failures – After a total power failure, the modules within the cabinet will 
automatically perform a power-up recovery without operator intervention after power 
is restored.