Справочник Пользователя для LSI AP1172-E1

Скачать
Страница из 70
72-Inch Cabinet Site Preparation  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1-10
Command Module and Drive Module Site Preparation Guide
Ladder Cords
Each AC power distribution box outlet supports one ladder cord (
) that you can 
connect to a maximum of six modules. You may connect up to twelve 220/230 VAC 
modules to each AC power distribution box for a maximum of twenty-four power 
attachments inside the cabinet.
Although the cabinet may not be fully populated when shipped, the cabinet is shipped with 
two ladder cords. Each cord has the following specifications:
Cord – 10 A per cord (1.67 A per connection if all are used)
Input Connector – IEC 320, C-19, 16 A, 250 VAC
Plugs – IEC 320, C-14, 10 A, 250 VAC
Ladder Step – 5.25 inches between connections
Cord Routing – Route cords between the mounting rails and side skins of cabinet
Figure 1-5  Cabinet Ladder Cord