Справочник Пользователя для Mitsubishi Electronics AJ65BT-D75P2-S3

Скачать
Страница из 666
 
 
 
9 - 6 
MELSEC-A
9   MAIN POSITIONING CONTROL 
 
(2)   Continuous positioning control 
 
(a)  The machine always automatically decelerates each time the positioning is 
completed. Acceleration is then carried out after the D75P2 command 
speed reaches 0 to carry out the next positioning data operation. If a dwell 
time is designated, the acceleration is carried out after the designated time 
elapses.  
(b)  In operation by continuous positioning control (operation pattern "01"), the 
next positioning No. is automatically executed. Always set operation pattern 
"00" in the last positioning data to terminate the positioning.  
 
If the operation pattern is set to positioning continue ("01" or "11"), the 
operation will continue until operation pattern "00" is found.  
 
The operation may be carried out until the max. data item No. 600 if 
operation pattern "00" cannot be found because it was not set in the last 
positioning data. 
 
Time
OFF
ON
OFF
ON
OFF
ON
OFF
Positioning continue (01)
Address (+) direction 
Address (-) direction
Positioning
complete (00)  
Dwell
time
ON
Positioning continue (01)
Start complete signal
BUSY signal
Positioning complete signal
[R(n+1)0, RY(n+1)1]
Positioning start signal
[RXn4, RXn5]
[RXn7, RXn8]
[RXn1, RXn2]
Dwell time not
designated
Fig. 9.2 Operation during continuous positioning control