Справочник Пользователя для Mitsubishi Electronics AJ65BT-D75P2-S3

Скачать
Страница из 666
 
 
 
11 - 6 
MELSEC-A
11   MANUAL CONTROL 
 
 JOG operation timing and processing time 
 
The following drawing shows details of the JOG operation timing and processing 
time.  
 
Reverse run JOG start signal
BUSY signal
Forward run JOG start signal
t2
Standing by
In JOG operation 
t1
t3
t4
Pulse output to an 
external source (PULSE)
Positioning operation 
Positioning complete signal
Axis operation status 
ON
ON
OFF
OFF
OFF
OFF
Standing by
[RY(n+1)6, RY(n+1)8] 
[RY(n+1)7, RY(n+1)9] 
[RXn4, RXn5] 
[RXn7, RXn8]
[RWrn+7, RWrn+15] 
Fig. 11.4 JOG operation timing and processing times 
 
 
Normal timing times                                           Unit: [ms] 
 
t1 t2 t3 t4 
1 to 60 
0 to 3.5 
6.5 to 10 
0 to 3.5 
 
 Delays may occur in the t1 timing time due to the following factors. 
 
1)  The operation status of other axes.  
2)  Whether there is intervention from a peripheral device during start 
processing. 
3)  Details of the positioning data to be started.