Справочник Пользователя для Mitsubishi Electronics AJ65BT-D75P2-S3

Скачать
Страница из 666
 
 
 
3 - 33 
MELSEC-A
3   SPECIFICATIONS AND FUNCTIONS 
 
 
Transient transmission
 
 
(1)  When master module is AJ61BT11, A1SJ61BT11, AJ61QBT11 or 
A1SJ61QBT11
 
(a) Calculation 
expression 
 
Details 
Calculation expression (Unit: ms) 
Master module   D75P2 
(write) 
{SM 2 + LS 6 (number of write points
*1
 + 16)/72
*2
LS + 
bps constant} N 
Master module   D75P2 
(read) 
{SM 2 + LS 5 (number of read points
*1
 + 16)/16
*2
LS + 
bps constant} N 
 
*1: Set in word unit 
*2: Rounded up to the one place 
SM  : Scan time of master module sequence program 
LS  : Link scan time (refer to the Master Module User's Manual) 
  : Number of read points 
1 to 120points  121 to 240points 241 to 360points 361 to 480points 
LS LS 2 LS 3 LS 4 
bps constant 
156kbps 625kbps 2.5Mbps  5Mbps  10Mbps 
LS LS 2 LS 4 LS 6 LS 7 
N  : Number of simultaneously executed commands 
 
(b) Calculation 
example 
The following example calculates the transmission delay time taken when 
"
Md.30
 Machine feed value" (2 words) is read from the D75P2. 
 
When SM is 20ms, transmission speed is 10Mbps, and only one D75P2 is 
connected 
LS:  1.8ms (for the calculation expression, refer to "(2) Calculation example in 
Cyclic transmission") 
 
Transmission delay time = {SM 2 + LS 5 + LS + (2 +16)/16 LS + LS 7} 1 
= {20 2 + 1.8 5 + 1.8 + (2 +16)/16 1.8 + 1.8 7} 1 
= 40 + 9 + 1.8 + 3.6 + 12.6 
= 67[ms] 
 
Therefore, the read machine feed value is the data after 67ms. 
However, when data is read from the buffer memory whose update timing is at 
56.8ms intervals
*1
, data after a maximum of 67 + 56.8 = 123.8ms is read as 
shown below depending on the read timing.
 
*1 
Md.37
 update timing is at 910ms intervals.
 
 
D75P2 update timing
56.8ms
56.8ms
56.8ms
56.8ms
Md. 30 Machine feed value
1)
Read
execution
Read
complete
67+1) (ms)