Справочник Пользователя для Mitsubishi Electronics AJ65BT-D75P2-S3

Скачать
Страница из 666
 
 
 
3 - 34 
MELSEC-A
3   SPECIFICATIONS AND FUNCTIONS 
 
(2)  When master module is QJ61BT11N
 
(a) Calculation 
expression 
 
Details 
Calculation expression (Unit: ms) 
Master module   D75P2 
(write (RIWT command)) 
OT + LS {BC + (number of write points
*1
 + 16)/72
*2
1.13} 
Master module   D75P2 
(read (RIRD command)) 
OT + LS {BC + (number of read points
*1
 + 16)/16
*2
1.067} 
 
*1: Set in word unit 
*2: Rounded up to the one place 
 
OT  : QCPU dedicated command processing time 
QnCPU 
:    1[ms] 
QnHCPU : 
0.5[ms] 
SM  : Scan time of master module sequence program 
LS  : Link scan time (refer to the Master Module User's Manual)  
BC 
156kbps 625kbps 2.5Mbps  5Mbps  10Mbps 
6 7 9 11 12 
 
(b) Calculation 
example 
The following example calculates the transmission delay time taken when 
"
Md.30
 Machine feed value" (2 words) is read from the D75P2 when the 
Q06HCPU is used. 
 
When SM is 20ms, transmission speed is 10Mbps, and only one D75P2 is 
connected 
LS  : 1.8ms (for the calculation expression, refer to "(2) Calculation  
example in Cyclic transmission") 
 
Transmission delay time = OT + LS {BC + (2 + 16)/16 1.067} 
= 0.5 + 1.8 {12 + (2 + 16)/16 1.067} 
= 0.5 + 1.8   14.134 
 25.9[ms] 
 
However, when data is read from the buffer memory whose update timing is at 
56.8ms intervals
*1
, data after a maximum of 25.9 + 56.8 = 82.7ms is read as 
shown below depending on the read timing. 
 
*1 
Md.37
 update timing is at 910ms intervals.
 
 
D75P2 update timing
56.8ms
56.8ms
56.8ms
56.8ms
Md. 30 Machine feed value
1)
Read
execution
Read
complete
25.9+1) (ms)